Ad space

🪵Deck Calculator

Work out deck boards, joists, beams, posts, screws and footing concrete for your new deck.

Your deck

You'll need about

29 deck boards

192 sq ft · 26 rows of 1 (incl. 10% waste)

sq ft

192

joists

13

posts

9

80 lb bags

45

beams

3

screws

676

🛒 Shopping list

  • Deck boards (16 ft)29 boards
  • Joists (2×8, 12 ft)13 joists
  • Beam boards (2×10, doubled)12 boards
  • Posts (6×6)9 posts
  • Concrete for footings (80 lb)45 bags
  • Deck screws (box of 350)2 boxes

Boards run the long way, joists run across. Check your local code for footing depth — it depends on your frost line.

How it works

Boards run the length of the deck. Rows = deck width ÷ (board width + ⅛–³⁄₁₆ in gap), and each row needs deck length ÷ board length boards. Joists run across the deck at your chosen spacing: joists = length ÷ spacing + 1. Beams sit about every 8 ft, with posts every 8 ft along each beam and about five 80 lb bags of concrete per footing.

Worked example

A 16 × 12 ft deck with 5.5 in boards, 16 ft long, joists 16 in apart:

  • 12 ft × 12 ÷ 5.69 in = 26 rows of 1 board → 29 boards with 10% waste
  • 16 ft × 12 ÷ 16 + 1 = 13 joists
  • 3 beam lines × 3 posts = 9 posts and 45 bags of concrete
  • 26 rows × 13 joists × 2 = 676 screws → 2 boxes

Questions people ask

16 in is standard for wood decking. Many composite boards need 12 in, especially laid on a diagonal. Check your board's instructions.

More calculators you might like

Email me my results

Pop in your email and keep your numbers handy at the store.

Last updated September 28, 2026. These results are friendly estimates to help you plan — always double-check before buying or making big decisions.